Hoover Dam Bypass - Colorado River Bridge

11 March 2010

The construction contract for the Colorado River Bridge, was awarded to the joint venture partnership of Obayashi Corporation and PSM Construction USA, Inc., in October of 2004 for US$ 114 million. Construction began in early 2005 and is expected to be completed in 2010. When completed, the 2000 ft-long (610 m) Colorado River Bridge will span the Black Canyon (about 1500 ft/457 m south of the Hoover Dam), connecting the Arizona and Nevada Approach highways nearly 900 ft (274 m) above the Colorado River. The construction requirements and challenges are as difficult as any in the world.
STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA