Hoover Dam Bypass - Colorado River Bridge

11 March 2010

The construction contract for the Colorado River Bridge, was awarded to the joint venture partnership of Obayashi Corporation and PSM Construction USA, Inc., in October of 2004 for US$ 114 million. Construction began in early 2005 and is expected to be completed in 2010. When completed, the 2000 ft-long (610 m) Colorado River Bridge will span the Black Canyon (about 1500 ft/457 m south of the Hoover Dam), connecting the Arizona and Nevada Approach highways nearly 900 ft (274 m) above the Colorado River. The construction requirements and challenges are as difficult as any in the world.
MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Construction Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Longer Reads
10 ways to join the hydrogen power revolution
Interest in the use of hydrogen has soared over the past few years as the construction industry races to reduce its carbon footprint. We roundup some recent initiatives
Telescopic boom lifts - the trends
Higher capacities and 100% electric models are the trend. And what lies ahead for 200ft models, or above?
How construction can become sustainable
The construction industry is undergoing a transformative shift to adapt more environmentally friendly practices
CONNECT WITH THE TEAM
Andy Brown Editor, International Construction Tel: +44 (0) 1892 786 224 E-mail: andy.brown@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA