World Bank supports Indian hydroelectric project

05 July 2011

The World Bank has loaned US$ 648 million to Indian state-owned power company THDC India to finance a 444 MW hydroelectric project.

The Vishnugad Pipalkoti hydroelectric plant on the Alaknanda River in the northern Indian state of Uttarakhand involves the construction of a 65 m diversion dam to create a small reservoir, and a 13.4 km tunnel to carry the water to an underground power station. All the diverted water will then be returned to the river.

Construction is scheduled for completion in 2013.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA