Video: Ferrovial’s heavyweight bridge manoeuvre

By Mike Hayes04 May 2021

Spanish construction giant rolls 2,200 tonne bridge into position over busy motorway

Ferrovial prepares to roll the Concordia Bridge into position in Madrid

Ferrovial recently completed the positioning of a bridge span in Madrid, by simply rolling the 2,200 tonne structure into position.

The video below shows how the Spanish contractor manoeuvred the 162m span from the side of the busy M-12 motorway, using self-propelled modular trailers (SPMTs).

The bridge has a deck width of 24.5m to accommodate two lanes of traffic in both directions, plus sidewalks.

The deck is constructed from 3m sections of steel, covered by a 0.25m-thick layer of concrete slab.

The bridge is balanced at each end with a counterweight, which is anchored to the ground with stakes under traction.

When open, the Concordia Bridge will create a direct connection between the Valdebebas area of Madrid and terminal 4 of the nearby Barajas Airport.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Construction Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Longer Reads
Computer vision AI sees the way forward
Salman Chaudhary, CEO at EmpiricAI, explains why computer vision AI offers a glimpse of the future of health & safety in the construction sector
How wearable technology is used in construction
Wearable technology is helping construction companies become more productive and is also boosting health and safety 
Post-pandemic demand lengthens delivery times for construction equipment
Government stimulus measures following the global pandemic have led to a surge in demand for construction equipment
CONNECT WITH THE TEAM
Andy Brown Editor, International Construction Tel: +44 (0) 1892 786 224 E-mail: andy.brown@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA