Timber construction in the spotlight at Zurich Airport

By Mike Hayes20 June 2022

Plans have been revealed to expand Zurich Airport, with the creation of a new pier, Dock A, to be constructed primarily from timber.

Exterior view of the proposed new Dock A building at Zurich Airport. Image: Bucarest Studio

Following an architecture competition, the winning design – called Raumfachwerk – came from a team comprising BIG, HOK and 10:8 Architekten. The sustainable principles of the team’s design promise to set new standards for sustainable airport construction.

The Dock A project will include the construction of a seven-storey building, with departure gates, retail space, lounges, offices and an air traffic control tower.

The primary building material will be engineered wood, which will form the load-bearing system of the new building – with huge V-shaped timber columns pointing to a transparent roof, made from solar panels. The building’s photovoltaic system is expected to cover some two thirds of the building’s annual electricity needs.

Interior vew of proposed Dock A, with timber columns supporting a photovoltaic roof. Image: Imigo

Andreas Schmid, chairman of the board of directors of Zürich Airport, said, “The ‘Raumfachwerk’ project was the most impressive, in particular in terms of sustainability, operations and the economic aspects, but also as regards urban planning and the architecture.”

Founder and director of BIG, Bjarke Ingels, said, “As airports grow and evolve and as international guidelines and safety requirements change, airports tend to become more and more complex.

“For the new main terminal of Zurich Airport, we have attempted to answer this complex challenge with the simplest possible response: A mass timber space frame that is structural design, spatial experience, architectural finish, and organisational principle in one.

“The striking structure is made from locally sourced timber, and the long sculptural body of the roof is entirely clad in solar shingles turning sunlight into a power source.”

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Construction Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Longer Reads
Interview: Doosan Bobcat’s Gustavo Otero
Construction Europe’s Cat Jones meets the Doosan Bobcat president to discuss everything from new innovations to a new beginning for hundreds of Ukrainians
Doosan’s new grade of crawler dozers
Company seeks to deliver top power in crawler dozers in its latest move to become a full line equipment supplier
3D printing: New tech being used to build in Africa
Holcim subsidiary 14Trees is the first firm to use 3D printing to build schools and affordable housing in countries across Africa
CONNECT WITH THE TEAM
Andy Brown Editor, International Construction Tel: +44 (0) 1892 786 224 E-mail: andy.brown@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA