The leaning tower of San Francisco

By Mike Hayes28 October 2016

A legal wrangle is ongoing in the US, where the tallest concrete structure ever constructed in San Francisco is both sinking and leaning.

The 58-storey, 196.5 m Millennium Tower in San Francisco has reportedly sunk 40.6 cm and is currently leaning 19.3 cm off of vertical at the top.

The skyscraper, home to 400 luxury condominiums, opened with much fanfare in 2009, and has won numerous architecture and engineering awards.

The developer of the tower, Millennium Partners, has pointed the finger of blame for the tower’s sinking at major excavation works taking place just a few metres away, where a bus and rail hub is currently under construction.

Millennium Partners says dewatering that took place when contractors began work on the Transbay Transit Center in 2010, caused the sand beneath the Millennium Tower to compact, causing the tower to sink.

Scott Boule of the Transbay Joint Powers Authority (TJPA) – which is a public body – hit back, saying the tilting and sinking of the tower was due “entirely to the failure of the foundation piles for the tower to reach bedrock”.

The tower rests on around 1,000 piles dug some 24 m into the ground. The argument currently revolves around whether this is secure enough from an engineering perspective and why there does not seem to be a paper trail showing when and why the authorities allowed the building to be constructed on packed sand as opposed to bedrock.

As the investigation into any wrongdoing continues, a group of residents from the tower has filed a lawsuit against both Millennium Partners and the Transbay terminal developers to recover losses on their property values.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Construction Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Longer Reads
10 ways to join the hydrogen power revolution
Interest in the use of hydrogen has soared over the past few years as the construction industry races to reduce its carbon footprint. We roundup some recent initiatives
Telescopic boom lifts - the trends
Higher capacities and 100% electric models are the trend. And what lies ahead for 200ft models, or above?
How construction can become sustainable
The construction industry is undergoing a transformative shift to adapt more environmentally friendly practices
CONNECT WITH THE TEAM
Andy Brown Editor, International Construction Tel: +44 (0) 1892 786 224 E-mail: andy.brown@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA