Liebherr Rostock produces 1,300th maritime crane

By Leila Steed12 July 2021

Liebherr-MCCtec Rostock has manufactured its 1,300th maritime crane – a LHM 550 mobile harbour crane.

The Liebherr Rostock LHM 550 model was ordered by Ghana Ports and Harbours Authority. The Liebherr LHM 550 harbour mobile crane was ordered by Ghana Ports and Harbours Authority

Liebherr-MCCtec Rostock has manufactured its 1,300th maritime crane – a LHM 550 mobile harbour crane.

The company, which has been manufacturing mobile harbour, offshore and ship cranes since 2005, said the landmark machine was one of two ordered by Ghana Ports and Harbours Authority (GHPA).

Designed for loading and unloading ships in the Capesize and New-Panamax classes, the LHM 550 model can handle bulk cargo weighing up to 154 tonnes and has an outreach of 54 metres. 

According to Liebherr Rostock, the new units were ordered as part of a fleet expansion programme and will be installed at the Port of Tema in West Africa. 

Located on the eastern coast of Ghana, the Port of Tema is the largest in the country. Every year it receives more than 1,500 cargo, tanker, Ro-Ro and cruise vessels.    

Ing. Stephen Kwamina Owiah, port logistics manager at GPHA, said, “We have a longstanding partnership with Liebherr. We are impressed with both Liebherr products and their service. It is not only the individual consulting but also the fast delivery that has promoted an expansion and increase of our business.”

Aerial view of the Liebherr LHM 550 about to be lifted The Liebherr LHM 550 mobile harbour crane being lifted aboard the BBC-Russia

At the time of writing in early July Liebherr’s 1,300th harbour crane was en-route to Ghana with its sister machine. On its arrival it was to become the eighth Rostock harbour crane in GHPA’s fleet.

The machines were being transported from Germany’s Rostock Port in the north of the country on the Baltic Sea coast.

The heavy-lift vessel BBC-Russia was to carry the fully assembled cranes for the more than 5,500 kilometre journey to their West African destination.

Gregor Levold, general manager for shipping and heavy lift handling at Liebherr-MCCtec Rostock, said, “The Rostock international port offers us ideal conditions for shipping the often large-dimensioned equipment. We now load 60 to 65 percent of the cranes in fully assembled condition.”

The 1,300th Liebherr harbour crane aboard the BBC-Russia vessel The 1,300th Liebherr harbour crane and its sister machine being prepared for transport to Ghana in their fully assembled states

World Crane Guide The most comprehensive crane reference guide in the world. KHL’s World Crane Guide is produced by International Cranes and Specialized Transport from data supplied by crane manufacturers and is the definitive reference source for equipment buyers in the crane and lifting industry.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Construction Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Longer Reads
5 ways to make remote working work
Keith Ali, MD at Creative ITC, explains how to overcome 5 common challenges when deploying remote working solutions to ensure AEC organisations realise business benefits from digital transformation.
COMMENT: Are we at the beginning of a golden decade in German construction?
Peter Gerstmann, chairman of the board of management of the Zeppelin Group discusses growing opportunities for the German construction sector
Can hydrogen engines turn construction green?
Hydrogen combustion engines move to centre stage as construction aims for zero emissions
CONNECT WITH THE TEAM
Andy Brown Editor, International Construction Tel: +44 (0) 1892 786 224 E-mail: andy.brown@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA