Kyrgyzstan sees country’s largest tunnel completed

By Catrin Jones01 September 2023

The Ministry of Transport in Kyrgyzstan is building a tunnel as part of the North-South Alternative Road project (Photo: AdobeStock)

News company Trend Agency has reported that the excavation of the Kok-Art tunnel, the largest tunnel in Kyrgyzstan, has been completed.

The Ministry of Transport in Kyrgyzstan is building a tunnel as part of the North-South Alternative Road project. This tunnel is located in the Kazarman-Jalal-Abad section of the road, along the border between Toguz-Toro and Suzak districts.

The projects goal is to ensure smooth traffic flow for two large vehicles traveling in opposite directions without causing any congestion. The entire project is estimated to cost US$136 million and is scheduled to be completed by the end of 2024.

The ministry began constructing the North-South alternative road in 2014, which spans 433 kilometers and costs a total of US$850 million. The road is built in difficult mountainous terrain to connect the northern and southern parts of Kyrgyzstan, which are separated by the Fergana Range.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Construction Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: andy.brown@khl.com
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: neil.gerrard@khl.com
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: catrin.jones@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA