Japan’s maglev project on track

By Andy Brown09 January 2018

Mag lev edited

It is expected that the train will be able to travel at speeds up to 505 kilometres per hour

Following the raid of three of Japan’s largest construction companies as part of a probe into possible bid-rigging on the US$80 billion magnetic levitation railway, the president of Central Japan Railway Company, Koei Tsuge, has reiterated his desire to open the line on schedule in 2027.

Japan’s first, second and third-ranked general contractors (Obayashi, Kajima and Shimizu) have recently been raided by the Tokyo district public prosecutor’s office.

Koei Tsuge said: “We’ll keep placing top priority on carrying out construction work for the maglev line to put it into service in 2027.”

The maglev train is expected to travel between Nagoya Station in Aichi Prefecture and Shinagawa Station in Tokyo in only 40 minutes. The line is slated to be extended to Osaka after the completion of the Shinagawa-Nagoya section.

As part of Japan’s economic stimulus, the government is providing YEN 3 trillion ($US 26.6 billion) in soft loans to support the project.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Construction Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Longer Reads
Computer vision AI sees the way forward
Salman Chaudhary, CEO at EmpiricAI, explains why computer vision AI offers a glimpse of the future of health & safety in the construction sector
How wearable technology is used in construction
Wearable technology is helping construction companies become more productive and is also boosting health and safety 
Post-pandemic demand lengthens delivery times for construction equipment
Government stimulus measures following the global pandemic have led to a surge in demand for construction equipment
CONNECT WITH THE TEAM
Andy Brown Editor, International Construction Tel: +44 (0) 1892 786 224 E-mail: andy.brown@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA