Innovative formwork used on New York development

Ulma, a concrete formwork and scaffolding company, is providing the formwork, shoring and climbing infrastructure for 30 Front Street, a residential development in, New York, US.

The curved side of the building required a unique solution (Photo: Ulma)

The 270-foot-tall development, Olympia Dumbo, is designed by Hill West Architects and developed by Fortis Property Group, is around 177,900 sq ft and will span residential units including penthouses and full-floor units.

The Spain-based company says that the floor layout is currently being done with their Aluminium Modular Formwork CC-4. Due to the height of the building, Ulma recommended Megaframe as the shoring solution due to the high-shoring heights.

Ulma chose their Timber Beam Slab Formwork Enkoflex to accommodate the distinctive curvature of the building - from the cellar to the sixth floor, the slab is curved with a big diameter.

The great advantage of Enkoflex said to be its versatility and adjustability to irregular geometries, says the company.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA