Bridge piles
25 April 2008
South Korean contractor Tuksu has used PTC’s 240HD (Heavy Duty) pile driver during construction of a new bridge between the island of Incheon and the Korean mainland.
The 240HD is currently driving 2.4 m and 3 m diameter casings, with wall thicknesses of 19 and 22 mm respectively, to a depth of 50 m. The pile driver features four 250 tonne clamps mounted directly under the gear box, powered by the PTC 1900 (1800 hp/1343 kW) power pack. This allows it to drive or extract heavy casings up to 3.6 m diameter to depths of 60 m.
STAY CONNECTED
Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.
CONNECT WITH THE TEAM
Neil Gerrard
Senior Editor, Editorial, UK - Wadhurst
Tel: +44 (0) 7355 092 771
E-mail: [email protected]
Catrin Jones
Deputy Editor, Editorial, UK – Wadhurst
Tel: +44 (0) 791 2298 133
E-mail: [email protected]