Battery manufacturer Northvolt to build $5bn gigafactory in Canada

Digital render showing how the Northvolt Six gigafactory will look Digital render showing how the Northvolt Six gigafactory will look (Image: Northvolt)

Swedish battery manufacturer Northvolt has revealed plans to build a US$5 billion (CAN$7 billion) lithium-ion battery gigafactory outside Montreal in the Canadian province of Quebec.

The factory, called Northvolt Six, will eventually be able to produce 60 GWh of cell manufacturing capacity annually, with adjacent facilities for cathode active material production and battery recycling which it said would allow circular production at the site.

Construction of the first 30 GWh phase of the project on the site in McMasterville and Saint-Basile-le-Grand is due to commence before the end of 2023. The first operations are set to begin in 2026.

This initial phase of cathode and cell manufacturing, coupled with recycling, is expected to require a total investment of 5 billion USD (7 billion CAD) and employ up to 3,000 people.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Construction Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: andy.brown@khl.com
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: neil.gerrard@khl.com
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: catrin.jones@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA