All Bridges Articles
Replacement of historic structure gets underway in the Port of Long Beach, near Los Angeles, in the US
Asian Development Bank loan to support construction of road connecting Ho Chi Minh City to Mekong Delta and southern coastal regions
Consortium to be awarded a 30-year contract to design, build, finance and operate a new six-lane toll bridge over the River Mersey in UK
Gammon Construction, which is 50% owned by Balfour Beatty, awarded HK$ 8.66 billion (US$ 1.1 billion) contract for Southern Connection Viaduct Section of Tuen Mun to Chek Lap Kok Link (TM-CLKL).
€275 million bridge built by FCC opens to traffic at end of six-year project
US infrastructure contractor Granite Construction is to commence work on the development of a new 3.1 mile long (5 km) Tappan Zee Bridge, connecting Rockland County to Westchester County in the Lower Hudson Valley.
RMD Kwikform has supplied a complete falsework and formwork system to the challenging Ljoen Bridge project, some 350 m above the floor of a Fjord.
Three international consortia have submitted final tenders for UK toll bridge project over the River Mersey between Runcorn and Widnes.
The government of Bangladesh has withdrawn a request for US$ 1.2 billion to help finance the Padma Bridge, the on-off project which has been mired in corruption allegations
Contract to build new, 5 km long Tappan Zee Bridge is significantly below the awarding authorities’ US$ 5.2 billion estimated cost.
With a central span of 530 m, the Atlantic Bridge will be the longest concrete cable-stayed bridge in the world
Vinci wins US$ 366 million project to construct 4.6 km bridge 75 m above sea level
Formwork solution with in-depth analysis to cope with complex loads during construction.
Bangladesh suspends all government employees and officials alleged to have been involved in corrupt acts over financing of bridge
Five groups in the hat with prequalification tender applications for Turkish bridges and highways.
Yangmingtan bridge in Harbin, Heilongjiang Province, opened in November last year.
New cable-stayed structure will have a 305 m central span and give 61 m of clearance to the Port of Long Beach's Back Channel.
The quick curing time of Stirling Lloyd's spray-on waterproofing system was an advantage on a major interchange project in Isa Town.
Large increase in federal funding could leverage up to US$ 50 billion in infrastructure investments
partnercontentplaceholder
blockintro
partnercontentplaceholder
blockintro
partnercontentplaceholder
blockintro
partnercontentplaceholder
blockintro