All Falsework & Formwork Articles
Growth buoyed by economic recovery, diversified model and acquisitions
Acquisition of scaffolding supplier enables Altrad’s entry into Ireland.
Lightweight, heavy-duty prop is the fruit of a research project with Monash University in Australia
New partnership with US scaffolding company AT-PAC will see Doka supply scaffolding globally to the construction market
More than 138 contractors and consultants worldwide completed the survey on high-rise projects
Managing director of Doka Group overseas replaces Dario Roustayan, who left Italian scaffolding and formwork company in January
Flexible formwork and design & engineering services from suppliers can be a key driver to successful construction projects, be they large or small.
Rising labour costs and the need for shorter project timelines is moving the market away from traditional hand-made wooden forms to more sophisticated systems
Although construction projects are getting more and more challenging, there is pressure on falsework and formwork suppliers to make their solutions more economical and shave time off schedules.
RMD Kwikform has supplied a complete falsework and formwork system to the challenging Ljoen Bridge project, some 350 m above the floor of a Fjord.
The company's Bauma stand will include new panel floor formwork Dokadek 30, Xbright framed enclosure, climbing formwork SKE100 and DokaCC for tunnel-building
MyPeri online customer portal will be presented for the first time at the Bauma show, together with a range of new products
Formwork solution with in-depth analysis to cope with complex loads during construction.
Falsework and formwork manufacturers are responding to the challenges of new builds with tailored solutions.
New shoring tower and edge protection system to be luanhced in Paris.
The 2010 FIFA World Cup kicks of today with nine South African cities playing host to 32 teams, playing 64 matches to find the 19th FIFA world champion.
The 133 m-high Orix Tower in Osaka, Japan is rising on an extremely cramped downtown site in the heart of the bustling megacity and Doka was chosen as the just-in-time supplier of the self-climbing formwork solution for the three-cell structure core. Richard High reports.
A small site. tight construction schedule and challenging tower geometry meant Doka's formwork engineers would be pushing the company's formwork solutions to their limits. Richard High reports.
The under construction Marina 101 is a one hundred and one floor, 425 m-tall tower close to the Palm Jumeirah and the exclusive Dubai Marina megaproject.
The skyline of Azerbaijan's oil city Baku on the shores of the Caspian Sea will be changed dramatically by the striking Flame Towers project.